Authorization of the issuance of an emergency purchase order to General Pump Company for a water well pump replacement at Well #27. (Cost: $201,895.82) (Action Item

Date:12/12/2023

OBJECTIVE

To receive City Council approval of an emergency purchase order for a water well pump replacement at Well #27 Reservoir, located within Magnolia Park on Chapman Avenue and Magnolia Street. 

BACKGROUND

The Garden Grove Public Works Department’s Water Services Division (“Division”) owns and operates the water system that provides water services throughout the city. The Division operates 17 total water production facilities, 13 wells, 5 pump stations, 8 reservoirs that hold approximately 53 million gallons of water. On July 31, 2023, a pump failure had occurred. General Pump Company was called out to diagnose the pump.  The well pump was reported to be operating under deficient conditions, which affects its reliability and will require a replacement. The total cost for the completed diagnosis work performed is $8,245.13. On November 29, 2023, the contractor was ordered to begin the replacement process by cleaning and video inspecting the pump, which may result in additional work needed depending upon inspection results. 

DISCUSSION

The continued operation of Well #27 is needed to supply water to the central area within the city. Due to this nature of work, the well pump replacement is considered emergency work and is scheduled for replacement. Failure to conduct this emergency work will result in the inability to pull groundwater from the well. Hence, affecting the safety, health and property of the community at large. Therefore, staff is seeking to designate these costs as emergency repairs and issue an emergency purchase order. 

FINANCIAL IMPACT

There is no impact to the General Fund. The total cost of this emergency water well replacement is approximately $193,650.69, plus the completed diagnosis work in the amount $8,245.13, for a total of approximately $201,895.82.  A 10 percent contingency will be applied for unexpected additional work identified during the inspection. This amount will be absorbed in the City’s adopted FY 2023-24 Water Enterprise Budget.

RECOMMENDATION

It is recommended that City Council:
 
  • Authorize an emergency purchase order with General Pump Company for a water well pump replacement at Well #27, in the total amount of $201,895.82 with a 10% contingency.
 

By: Samuel Kim, P.E.