| | | | | | | | Agenda Item - 4.c.
City of Garden Grove
INTER-DEPARTMENT MEMORANDUM
To: | Scott C. Stiles
| From: | William E. Murray
| Dept.: | City Manager
| Dept.: | Public Works
| Subject: | Award a contract for Project 7402 - Magnolia Reservoir and Booster Pump Station Rehabilitation to Pacific Hydrotech Corporation. (Cost: $3,204,880) (Action Item) | Date: | 11/24/2020 |
|
| | | | | | | | OBJECTIVE
To recommend that City Council award a contract to Pacific Hydrotech Corporation for construction of Project No. 7402 – Magnolia Reservoir and Booster Pump Station Rehabilitation Project. |
| | | | | | | | BACKGROUND
The City completed the condition evaluation and assessment of its eight reservoirs in December 2013. A list of recommended repairs and rehabilitation for each reservoir was established. Following the condition evaluation and assessment, the design of the repair and rehabilitation for Magnolia Reservoir was completed in 2017.
The Magnolia Reservoir and Booster Pump Station Rehabilitation Project consists of the repair work for the buried pre-stressed concrete reservoir and the booster pump station located at Magnolia Park. The extent of the work is as follows: The reservoir repairs consist of crack, spall, and joint repair, construction of seismic curb, roof waterproofing, rust spot repair, and the addition of a fall protection system. Site Improvements include rerouting the existing sub-drain sump pump piping, replacement of the sump hatch and sump vault lid and hatch, repair of the overflow flap gate, construction of a new parking lot and ADA ramp, installation of bollards and a mow strip around the reservoir, and replacement of the meter vault and piping. The repair work for the pump station consists of replacement of the existing engine and booster pump, replacement of the existing exhaust system, replacement of the existing catalytic converter, replacement of two 10-inch butterfly valves, replacement of the 10-inch check valve, refurbishment of the existing flow control valve, and replacement of the roof and existing removable dormer. |
| | | | | | | | DISCUSSION
Five (5) bids were received and opened by the City Clerk’s Office on October 20, 2020, at 10:00 a.m. (see Bid Summary Sheet). The lowest responsive bidder is Pacific Hydrotech Corporation, with a total bid of $3,204,880. The licenses and references of the contractor have been reviewed and verified by staff, and all other documentation is in order. The anticipated contract schedule is as follows:
Award Contract November 24, 2020
Begin Construction January 2, 2021
Complete Construction February 2, 2022 |
| | | | | | | | FINANCIAL IMPACT
There is no impact to the General Fund. This project is included in the 2020-2021 Capital Improvement Budget, and will be financed with Water Funds, in the amount of $3,204,880. |
| | | | | | | | RECOMMENDATION
It is recommended that the City Council:
- Award a contract for the construction of Project No. 7402 - Magnolia Reservoir and Booster Pump Station Rehabilitation, in the amount of $3,204,880, to Pacific Hydrotech Corporation; and
- Authorize the City Manager to execute the contract on behalf of the City, and to make minor modifications as appropriate.
By: Rebecca Li, Sr. Civil Engineer
|
ATTACHMENTS: | Description | Upload Date | Type | File Name | Bid Summary Sheet | 11/2/2020 | Backup Material | StaffAwd_Const_PacificHydrotech_Project7402_BidSummary.pdf | Construction Agreement | 11/9/2020 | Agreement | Construction_Agreement_Project_7402-Magnolia_Reservoir___BPS_signed.pdf |
|
|